[Back to the Five] Build Roads Faster

[Back to the Five] Build Roads Faster 2018-08-09

merchant.jpg


Once a merchant makes a round trip, the trade is finished (at least 20 turns before).

Land range of merchant not 10(was 15).

Simply,

Before Change, Mininum turns for constructing road is 20 turns.

After Change, Maximum turns for constructing road is 20 turns
Author
Hominute
Downloads
512
Views
512
First release
Last update
Rating
0.00 star(s) 0 ratings

More resources from Hominute

Top Bottom