470 triangles (without propeller) and 256x256 texture.
Thread
The H-5 was designed to provide a helicopter having greater useful load, endurance, speed, and service ceiling than the Sikorsky R-4. The first XR-5 of four ordered made its initial flight on August 18, 1943. In March 1944, the United States Army Air Forces ordered 26 YR-5As for service testing, and in February 1945, the first YR-5A was delivered.
Source: Wikipedia
Thread
The H-5 was designed to provide a helicopter having greater useful load, endurance, speed, and service ceiling than the Sikorsky R-4. The first XR-5 of four ordered made its initial flight on August 18, 1943. In March 1944, the United States Army Air Forces ordered 26 YR-5As for service testing, and in February 1945, the first YR-5A was delivered.
Source: Wikipedia