Precharging a settler/engineer means you let them start doing something that will not be done right away and then you click on them and stop them from doing it. By doing this the unit accumulates one charge. If you do this n times in a row, it accumulates n charges. If you want to do something that takes n+1 turns you precharge n turns and then when you command the unit to do it, it happens in one turn.