...holding for the update....
Movement for Spring, 1909
Results:
Austria:
Austria: F adr Supports F aeg > ion
Austria: A boh -> mun, Failed because Austria: A mun -> bur failed.

Austria: A bul -> gre
Austria: A bur -> mar, Bounced with pie (1 against 1).
Austria: A gre -> alb
Austria: A mun -> bur, Bounced with ruh (1 against 1).
Austria: F tri Supports F adr
Austria: A tyr Supports A ven -> pie
Austria: A ven -> pie
Austria: A vie -> bu
England
England: F cly Holds

England: A hol Holds

England: F nth Holds

England: F nwg Holds

England: F ska Holds
Germany:
Germany: A den -> kie: Bounced with kie (1 against 1). Dislodged from bal (3 against 1): The Army in Denmark cannot retreat; unit destroyed.

Germany: A ruh -> bur: Bounced with mun (1 against 1).
Italy:
Italy: F apu Supports F ion -> adr
Italy: F bre -> eng
Italy: F ion -> adr: Bounced with adr (2 against 2). Dislodged from aeg (2 against 1).

Italy: F mao -> iri
Italy: F nap -> ion Failed.
Italy: A pie -> mar: Bounced with bur (1 against 1). Dislodged from ven (2 against 1).

Italy: A rom -> ven
Russia:
Russia: F aeg -> ion
Russia: F bal -> den
Russia: F bar -> nwg: Bounced with nwg (1 against 1). :Rolleye:
Russia: A con Holds
Russia: A fin -> nwy Failed because F nwy -> nth failed.

Russia: A kie Supports F bal -> den
Russia: F nwy -> nth: Bounced with nth (1 against 1).

Russia: A stp -> lvn
Russia: A swe Supports F bal -> den
Russia: A war -> sil
Deadline for Retreats:
Thursday, 24:00 GMT
Units to be retreated:
Italy:
A Piedmont: Can only retreat to Tus
F Ionian Sea: Can retreat to Tun or TyS
jDip File: emailed to the remaining 4 powers.
Deadline for Fall moves:
Sunday, 24:00 GMT
Considering that there are lots of holidays approaching, I propose a doubling of the usual deadlines: retreats and builds, which normally have 48 hours, would have 4 days. Movements would have 5 days, rather than the usual 3 days. After the calendar changes over to .08, we can revert to the usual pace. Of course, we could always move to a 'trigger' tempo: as soon as all orders are received, before the deadline, orders will be processed. Thoughts?