Movement for Spring, 1909
Results:
Austria:
Austria: F adr Supports F aeg > ion
Austria: A boh -> mun, Failed because Austria: A mun -> bur failed.

Austria: A bul -> gre
Austria: A bur -> mar, Bounced with pie (1 against 1).
Austria: A gre -> alb
Austria: A mun -> bur, Bounced with ruh (1 against 1).
Austria: F tri Supports F adr
Austria: A tyr Supports A ven -> pie
Austria: A ven -> pie
Austria: A vie -> bu
England
England: F cly -> nao
England: A hol -> bel
England: F nth -> hol
England: F nwg Holds
England: F ska -> nth Bounced with nwy (1 against 1).
Germany:
Germany: A den -> kie: Bounced with kie (1 against 1). Dislodged from bal (3 against 1): The Army in Denmark cannot retreat; unit destroyed.

Germany: A ruh -> bur: Bounced with mun (1 against 1).
Italy:
Italy: F apu Supports F ion -> adr
Italy: F bre -> eng
Italy: F ion -> adr: Bounced with adr (2 against 2). Dislodged from aeg (2 against 1).

Italy: F mao -> iri
Italy: F nap -> ion Failed.
Italy: A pie -> mar: Bounced with bur (1 against 1). Dislodged from ven (2 against 1).

Italy: A rom -> ven
Russia:
Russia: F aeg -> ion
Russia: F bal -> den
Russia: F bar -> nwg: Bounced with nwg (1 against 1). :Rolleye:
Russia: A con Holds
Russia: A fin -> nwy Failed because F nwy -> nth failed.

Russia: A kie Supports F bal -> den
Russia: F nwy -> nth: Bounced with ska (1 against 1).

Russia: A stp -> lvn
Russia: A swe Supports F bal -> den
Russia: A war -> sil
Deadline for Retreats:
Saturday, 24:00 GMT
Units to be retreated:
Italy:
A Piedmont: Can only retreat to Tus
F Ionian Sea: Can retreat to Tun or TyS
jDip File: emailed to the remaining
4 5! powers.
Deadline for Fall moves:
Monday, 24:00 GMT
Admin's Comment:
I'm really sorry about the deadline snafu last time. Sometimes it's easy to forget that I'm only here to help your game along.
So what sort of grace period should we use? 12 hours? 24? Also, please comment on the proposed holiady schedule, which would hold for approximately the next two weeks.
Considering that there are lots of holidays approaching, I propose a doubling of the usual deadlines: retreats and builds, which normally have 48 hours, would have 4 days. Movements would have 5 days, rather than the usual 3 days. After the calendar changes over to .08, we can revert to the usual pace. Of course, we could always move to a 'trigger' tempo: as soon as all orders are received, before the deadline, orders will be processed. Thoughts?