Bair_the_Normal
転輪聖王
FREE CHINESE ARMY DEVELOPMENTAL ARSENAL
Spoiler :
Shíyàn 43 Shì Zìdòng Bùqiāng/实验43式自动步枪[QZB-QY43] [Experimental Type 43 Rifle] [QZB-43]
Country of Origin: Sìchuān
Caliber: 7.2x52mm DBP97
Length: 680 mm
Barrel Length: 510 mm
Weight: 3.71 kg
Rate of Fire: 650 RPM
Magazine Capacity: 30 rds
Spoiler :
Shíyàn 27 Shì Chōngfēng Qiāng/实验27式衝鋒槍 [QCF-QY27] [Experimental Type 27 Submachine Gun] / Shíyàn 27 Shì Chōngfēng Kǎbīn Qiāng/实验27式衝鋒卡賓槍 [QFK-QY27] [Experimental Type 27 Submachine Gun-Carbine]
Country of Origin: Sìchuān
Caliber: 9x19mm Parabellum
Length: 710 mm [505 mm for Carbine (excluding suppressor)]
Barrel Length: 370 mm [165 mm for Carbine]
Weight: 2.6 kg
Rate of Fire: 900 RPM
Magazine Capacity: 55 rds
Spoiler :
Shíyàn 77 Shì Jūjī Bùqiāng/实验77式狙击步枪 [QJB-QY77] [Experimental Type 77 Sniper Rifle]
Country of Origin: Sìchuān
Caliber: 12.7x108mm
Length: 725 mm
Barrel Length: 685 mm
Weight: 13.5 kg
Action: Bolt Action
Magazine Capacity: 10 rds
Spoiler :
Shíyàn 77 Shì Tōngyòng Jīqiāng/实验77式通用机枪 [QTJ-QY77] [Experimental Type 77 Light Machine Gun]
Country of Origin: Sìchuān
Caliber: 7.2x52mm DBP97
Length: 1,044 mm
Barrel Length: 553 mm
Weight: 13.34 kg
Rate of Fire: 600 RPM
Magazine Capacity: 200 rds
Spoiler :
Shíyàn 32 Shì Huǒjiàntǒng/实验32式火箭筒 [HJT-QY32] [Experimental Type 32 Rocket Propelled Grenade]
Country of Origin: Sìchuān
Caliber: 75HJLD Huǒjiàn Liúdàn火箭榴弹
Length: 1024 mm
Weight: 10.9 kg
Spoiler :
Shíyàn 77 Zhǐdìng Shénqiāngshǒu Bùqiāng/实验77式指定神枪手步枪 [QSB-QY77] [Experimental Type 77 Designated Marksman Rifle]
Country of Origin: Sìchuān
Caliber: 12.7x108mm
Length: 1025 mm
Barrel Length: 650 mm
Weight: 5.5 kg
Rate of Fire: Semi-automatic
Magazine Capacity: 20 rds
PROJECTED PLANS FOR TMSBR REACTORS, LHASA, CHENGDU
TMSBR test reactor results have proven successful. Construction on the two conceived TMSBR reactors and facilities in Lhasa and Chengdu will resume posthaste. Vague results published at the moment project energy production from both of these plants to provide approximately ~56% of Sìchuān’s energy needs. Time frame gives Chengdu approximately one and a half years, optimistically, to see the facilities reach maximum potential, though the first reactors and safety measures can be installed and brought to working order within a half year. As such, alongside the other mining ambitions, Tibetan Thorium facilities will be converted within the year to provide a steady source of fuel for our new reactors. Nuclear plants around the area will also be renovated to perhaps welcome new thorium plants if the need may come in the near future.
TIBETAN ECONOMIC ADVANCEMENTS
The new Autonomous Province of Tibet has a plethora of various minerals and resources yet untapped by former governments. Deposits of zinc, copper, lead, salt, soda, potash, and borax will all be exploited to their maximum potential, without scarring the beautiful Tibetan landscape using the most modern mining methods and equipment. Various mining operations across the Autonomous Province will provide a much-needed boon to the Sìchuānese economy, as well as provide greater economic stability and autonomy to Sìchuān.

