PhroX
Deity
- Joined
- Jan 12, 2009
- Messages
- 2,804
So, I've gotten all my projects at work as far as I can - two things handed on to other teams for their input, one thing waiting for a simulation to run - and thus I have no work to do. And while this last fact is generally quite a pleasant thing, the rant is that all three things are inevitably going to come back to me at the same time. So in a couple of days, I'll go from nothing to do, to having three things all of which need doing at the same time. This shouldn't have happened - the simulation was meant to run over the weekend but I made a stupid mistake in the configuration (managed to have an inflow of air instead of water) and the results were consequently not what I wanted...
